(Case Study) Removal Project: Armoured Edition

LGH supports Cambridge removal for DLR Industrial Services
Posted in: Case Studies

LGH recently supported DLR Industrial Services with equipment for their project removing items in central Cambridge for Demcom Ltd.
 
The Challenge: 
 
We were tasked with providing equipment to help remove two safes and an armoured door from the basement of a building, as well as remove a single safe from the first floor. The removal needed to be conducted securely and efficiently, considering the sensitive nature of the assets.

The Solution: 

To ensure their project was smooth sailing, we provided DLR Industrial Services with the following equipment:

With the assistance of our equipment, DLR Industrial Services successfully removed the safes, armoured door, and single safe from the building. The process was conducted safely and efficiently, without any damage to the assets or the building structure and the team were able to complete the job in their scheduled timeframe. LGH is proud to have supported this project, and we look forward to continuing our partnership in the future.

2 January 2024
102 view(s)
Did you like this post?
0
0