(Case Study) Rigging Solution for a "King-sized" Project

(Case Study) Rigging Solution for a "King-sized" Project
19 April 2023 121 view(s)
(Case Study) Rigging Solution for a "King-sized" Project

Looking for a lifting and rigging solution that can handle "king-sized" projects? We've got you covered as the lifting partner of choice.

Recently, we successfully completed two lifts as required to install a new bridge at the Richard III Museum in Leicester. Our customer utilised a centre point beam solution due to low headroom at their workshop, and Modulift modular spreader beams at the museum in Leicester.

The solution, a collaboration between LGH & Gerrard Cranes, was instrumental in the success of these lifts and provided the necessary support and stability for a smooth, safe and efficient lift even with minimal headroom.

If you're facing a complex lift, don't stress - let our team take care of it. We've got the expertise and equipment to handle any challenge, big or small.

Powered by Amasty Magento 2 Blog Extension