Looking for a lifting and rigging solution that can handle "king-sized" projects? We've got you covered as the lifting partner of choice.
Recently, we successfully completed two lifts as required to install a new bridge at the Richard III Museum in Leicester. Our customer utilised a centre point beam solution due to low headroom at their workshop, and Modulift modular spreader beams at the museum in Leicester.
The solution, a collaboration between LGH & Gerrard Cranes, was instrumental in the success of these lifts and provided the necessary support and stability for a smooth, safe and efficient lift even with minimal headroom.
If you're facing a complex lift, don't stress - let our team take care of it. We've got the expertise and equipment to handle any challenge, big or small.
(Case Study) Rigging Solution for a "King-sized" Project
Posted in:
Case Studies
19 April 2023
97 view(s)
Did you like this post?
0
0
Related Post Products
Search The Blog
Recent Posts
-
(Case Study) Powering the Future, One Hoist at a Time11 September 2024
-
(Our Team) Johnpaul Hemming - Account Manager25 July 2024