Seatank Terminal, Antwerp is currently constructing a new site at quay 700.

Our customer is building the construction of a concrete jetty where ships will moor to pump their liquids to the terminal, and has chosen LGH Europe to deliver the material for this.

Including a square modulift system and a modulift, as seen on the photos. The middle is half a meter shorter than the frame with the aim to create 6 lifting points. With heavy hand chain hoists and test clocks we were able to ensure that the force was evenly distributed over the lifting points.

For all involved, a cool job under a beautiful clear blue sky.

View the Modulift Spreader Frame here.